O’Hare Central Deicing Facility – Paving and Utilities
Aviation
As we all know, O’Hare is one of the busiest airports in the world. In 2019 we were topping the 900,000 flight operations. Due to this, building a new aircraft deicing facility has become a game changer for all operations, especially during winter.

ORD Terminal 5 Concourse M Extension
Aviation
ORD Terminal 5 Expansion is one of the biggest projects that is taking place at O’Hare at this time. This project is part of the O’Hare -21 program. After registering over 80 million passengers in 2018, it was more than sufficient to consider a new expansion in Terminal 5.

MWRD of GC Tollway Dam, Grout Curtain and Quarry Plugs
Water/Waste Water
The work consists of construction of a 208’ wide by 116’ tall roller compacted concrete gap dam; construction of reinforced concrete quarry plugs; Construction of a 9,425-foot double-row grout curtain extending around the perimeter of the Reservoir to depths of 550 feet below ground; and installation of associated instrumentation.

Defense Logistics Agency Fire Suppression Upgrade – Hammond Depot
Federal/Defense
This project consisted of upgrading an old fire suppression system in three warehouses for the Department of Defense- Defense Logistics Agency (DLA) Strategic Materials Hammond Depot. Cabo Construction provided Labor, Administrative Support as well as Contract Management on the project.

Wacker Drive / Congress Parkway Interchange Improvements
Transportation
Scope included, but not limited to the demolition of existing interchange roadways, including tunnels; existing foundation rehab; deck and beam replacement, widening of the Congress Parkway fixed spans; and new tunnels from lower Wacker to westbound Congress.